John Ware was a past employee of the Kitimat Town Planning Department (1957-1959). He was hired by Hollister Kent, Planning Director for Kitimat. During his two years here, Dr. ware designed the first Kitimat street signs, the Haisla Boulevard overpass, and the Hirsch Creek Park shelter centennial project (1858-1958). He was layed off when Alcan lost major Aluminum buyers and the town expansion halted, resulting in a cut back of Kirtimat employees. He then moved to the USA.
Custodial History
Donated by John Ware.
Scope and Content
Photographs of Kitimat street and information signs. Aluminum and wooden mock-ups.
Six signs. Black & white. Bus Stop, Walkway, Taxi, W Capilano, Capilano S, and Osprey.
Six signs. Colour. Bus Stop, Walkway, Taxi, W Capilano, Capilano S, and Osprey.
Three signs with directional arrows. Black and white. City Centre, Nechako Centre, and Service Centre.
Three signs with directional arrows, installed. Black & white. Nechako Centre, City Centre, and Service Centre.
Six signs. Black and white. Parcel Pickup 3 Min Parking, Taxi, Commercial Loading No Parking, City Centre, Nechako Centre, and Service Centre.
Six signs. Colour. Parcel Pickup 3 Min Parking, Taxi, Commercial Loading No Parking, City Centre, Nechako Centre, and Service Centre.
Two signs, installed. Colour. Egret and Finch street signs installed.
Two signs, installed. Black & white. E Fourth, and Industrial S.
Three photographs of an Indigenous Bridge Exhibit, Berry Display, and a Broad Leafed Trees Display (Jul 1979). One Photograph is of a log structure at Squirrel Mountain (1971).
1 photograph print : b&w ; 12.5 x 9cm
2 photograph prints : b&w ; 9 x 13cm
1 photograph print : b&w ; 9 x 9cm
Custodial History
Photographs taken by Gisela Mendel in her role as museum curator.
Scope and Content
Three photographs of an Indigenous Bridge Exhibit, Berry Display, and a Broad Leafed Trees Display (Jul 1979). One Photograph is of a log structure at Squirrel Mountain (1971).
Negatives showing large steel parts for the mill and other steel structures that were on the Eurocan site after roughly the first 1.5 years of construction.
Negatives showing large steel parts for the mill and other steel structures that were on the Eurocan site after roughly the first 1.5 years of construction.