Negatives showing large steel parts for the mill and other steel structures that were on the Eurocan site after roughly the first 1.5 years of construction.
Negatives showing large steel parts for the mill and other steel structures that were on the Eurocan site after roughly the first 1.5 years of construction.
Photographs of panorama of smeltersite from water tower. 1 - not quite to pole. 2 - pole to small pole. right hand corner. 3 - some pole at 2 to left one of 2 doubles. 4 - Just beyond. Left of double.
Photographs of panorama of smeltersite from water tower. 1 - not quite to pole. 2 - pole to small pole. right hand corner. 3 - some pole at 2 to left one of 2 doubles. 4 - Just beyond. Left of double.
Photographs of smeltersite panoramas. First panoramas ever taken of the area.
Notes
Smeltersite - lens 21 3/8 off board.. 24 for pictire at F11 + 8sec for sky rt hand pictire cutoff grad. 9 sec from end.
Maincamp - 8x10. Dense 23 7/8" of board. 38 sec F11 + 10 sec extra for sky.