Jamieson came to Kitimat from Vancouver to work on the Alcan project in 1952. With his first pay cheque he bought a small "Pony Kodak" camera at the local store (Hudson Bay?), and started taking coloured slides of the Kitimat from 1952-1953. Left Kitimat at the end of August 1953 to move to Montreal.
Scope and Content
Slide of smeltersite as seen from the dredge "townsend".
Photograph of Smeltersite. Taken from the top deck of the 'Delta King' showing the Rec. Hall and Fred?? top at left. This was rior to the closing of Helen's Cafe. Note pump and ?? ?ground. Pump used to keep water out of coffer dam around Delta King. Seven ?? rainwater combined with high tide to float the ship, breaking all steam lines ???.
Photograph of Smeltersite. Taken from the top deck of the 'Delta King' showing the Rec. Hall and Fred?? top at left. This was rior to the closing of Helen's Cafe. Note pump and ?? ?ground. Pump used to keep water out of coffer dam around Delta King. Seven ?? rainwater combined with high tide to float the ship, breaking all steam lines ???.
Taken from top deck of Delta King showing Rec. Hall + Feed Ryan's workshop at left. Prior to closing of Helen's Cafe. Note Pum.p + Steam in forground. The pump was used to keep waterout of Coffer Dam around Delta King + is used to heat Rec. Hall, Hospital, School, Bunkhouses, and Cafeteria
Taken from top deck of Delta King showing Rec. Hall + Feed Ryan's workshop at left. Prior to closing of Helen's Cafe. Note Pum.p + Steam in forground. The pump was used to keep waterout of Coffer Dam around Delta King + is used to heat Rec. Hall, Hospital, School, Bunkhouses, and Cafeteria
View of the bow of the Delta King while dry docked at the Alcan Smelter Site. Used as a temporary residence for Alcan workers. Preparations for refloating are in progress.
View of the bow of the Delta King while dry docked at the Alcan Smelter Site. Used as a temporary residence for Alcan workers. Preparations for refloating are in progress.
View of the Delta King stern while dry docked at the Alcan Smelter Site. Used as a temporary residence for Alcan Workers, preperations for re-floating are in progress.
View of the Delta King stern while dry docked at the Alcan Smelter Site. Used as a temporary residence for Alcan Workers, preperations for re-floating are in progress.