Photograph of view of Kitimat River bridge looking west. East pier in foreground showing whalers in place with sheet piling driven to grade. Center pier-right-two bearingpiles driven to required bearing. Left-sixty foot pile in place for splicing. Temporary bridge-crew completing placing rock in pier.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view of Kitimat River bridge looking west. East pier in foreground showing whalers in place with sheet piling driven to grade. Center pier-right-two bearingpiles driven to required bearing. Left-sixty foot pile in place for splicing. Temporary bridge-crew completing placing rock in pier.
Photograph of view looking west at bridge site showing Kitimat River at elevation 45. Centre pier of permanent bridge at right with formwork for final concrete pour.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view looking west at bridge site showing Kitimat River at elevation 45. Centre pier of permanent bridge at right with formwork for final concrete pour.
Photograph of aerial view looking north at the plant site, with H.M.C.S. Sioux at the wharf. Tide elevation is approximately 2.5 feet, and the extent of the dredge cut in the harbour can be clearly seen.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of aerial view looking north at the plant site, with H.M.C.S. Sioux at the wharf. Tide elevation is approximately 2.5 feet, and the extent of the dredge cut in the harbour can be clearly seen.
Photograph of smeltersite looking east. Service building area in middleground with pre-cast wall panels in position. Pre-cast concrete yard in foreground.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of smeltersite looking east. Service building area in middleground with pre-cast wall panels in position. Pre-cast concrete yard in foreground.
Photograph of smeltersite looking east. Foreground, perforated concrete pipe for ground water ditch. Middleground, pre-cast concrete yard with storage stacks at right. Structural steel partially complete in service buildings lines D to M. Footings for pot line 2 at right.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of smeltersite looking east. Foreground, perforated concrete pipe for ground water ditch. Middleground, pre-cast concrete yard with storage stacks at right. Structural steel partially complete in service buildings lines D to M. Footings for pot line 2 at right.
Photograph of smeltersite looking east, showing partially completed service buildings at left and work proceeding on rectifier buildings in foreground. Temporary covers for the center passageway buildings can be seen beyond the west half of the pot rooms.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of smeltersite looking east, showing partially completed service buildings at left and work proceeding on rectifier buildings in foreground. Temporary covers for the center passageway buildings can be seen beyond the west half of the pot rooms.
Photograph of looking N.E. at storage building area of hydraulic fill showing west half of area filled to elavation 20 feet. Stripping sarted again in pond area at right centre.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of looking N.E. at storage building area of hydraulic fill showing west half of area filled to elavation 20 feet. Stripping sarted again in pond area at right centre.
Photograph of aerial view of the Kitimat River bridge site looking east. The townsite camp can be seen at upper right. The building erected at left centre on the river bank is the clubhouse of the Kitimat Rod & Gun club.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of aerial view of the Kitimat River bridge site looking east. The townsite camp can be seen at upper right. The building erected at left centre on the river bank is the clubhouse of the Kitimat Rod & Gun club.
Photograph of view of Kitimat terminal wharf #1 looking south from a point on conveyor gallery C1 showing the alumina handling plant, and rail being laid on the wharf deck.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view of Kitimat terminal wharf #1 looking south from a point on conveyor gallery C1 showing the alumina handling plant, and rail being laid on the wharf deck.