Title based on content of photograph. -- Haisla Bridge, Kitimat's first permanent bridge was completed by the end of 1953 and officially opened in 1957. -- The cost was over one million dollars. District of Kitimat Collection. District of Kitimat Collection 987.10.2
Photograph of left in the background the sandhill operation of the other side of the Kitimat River. The road along the flats to the construction of the smelter.
Photograph of left in the background the sandhill operation of the other side of the Kitimat River. The road along the flats to the construction of the smelter.
Photograph showing the kitimat river during winter. A D8 CAT bulldozer can be seen crossing the river with a man in a rowboat alongside. The photo is looking east toward townsite road clearing.
Photograph showing the kitimat river during winter. A D8 CAT bulldozer can be seen crossing the river with a man in a rowboat alongside. The photo is looking east toward townsite road clearing.
Photo depicts Kitimat Constructors Project Manager Hal Whiting on right, standing beside a unidentified man. Both watch the construction activity occurring down on the tidal flats in front of them, site for the smelter.
Photo depicts Kitimat Constructors Project Manager Hal Whiting on right, standing beside a unidentified man. Both watch the construction activity occurring down on the tidal flats in front of them, site for the smelter.
Notes
Title based on content of photograph. -- Photographed by the International Harvester Company, manufacturers of construction equipment purchased for the Project. Hal Whiting Collection 985.65.99