Looking East, showing bearing piles being driven in centre pier, and sheet piling in position for driving at East pier. Note traffic on temporary bridge.
Looking East, showing bearing piles being driven in centre pier, and sheet piling in position for driving at East pier. Note traffic on temporary bridge.
Photo showing the path to the Kitimat water supply. The water tower can be seen up near the top of a hill in the photo with the path flanked by trees. The pathway is made of a wooden ramp and there is a long hose coming down from the tower with at least two People seen at the towers base.
Photo showing the path to the Kitimat water supply. The water tower can be seen up near the top of a hill in the photo with the path flanked by trees. The pathway is made of a wooden ramp and there is a long hose coming down from the tower with at least two People seen at the towers base.