8 photos of Alcan Engineering. 1) Looking East From Centre Passageway Bldg 7B 2) Completed Roof Fan Walking on Potroom 8B West 3) Looking West in Potroom 8B West from Column Line 12 4) Potroom 8B East Looking East from Centre Passageway 5) General View of Progress of Work in Potline 8A East 6) Potroom 8B East Looking East from Centre Passageway 7) Looking East from Centre Passageway Bldg 8A 8) Looking West from Centre Passageway Bldg 8A
8 photos of Alcan Engineering. 1) Looking East From Centre Passageway Bldg 7B 2) Completed Roof Fan Walking on Potroom 8B West 3) Looking West in Potroom 8B West from Column Line 12 4) Potroom 8B East Looking East from Centre Passageway 5) General View of Progress of Work in Potline 8A East 6) Potroom 8B East Looking East from Centre Passageway 7) Looking East from Centre Passageway Bldg 8A 8) Looking West from Centre Passageway Bldg 8A
Album showing Memorabilia of Alcan Kitimat Works employees. All the photos have been taken from the Ingots - unfortunately, not all have dates and years to identify the photos.
Album showing Memorabilia of Alcan Kitimat Works employees. All the photos have been taken from the Ingots - unfortunately, not all have dates and years to identify the photos.
Negatives showing the Nechako Reservoir, the Kenney Dam, & the Skins Lake Spillway which were built to create hydroelectric power to be used by the Alcan aluminum smelter in Kitimat. Also pictured is Des Lake, Alcan barge Tahtsa II at East Tahtsa, a view of the Entiako River as it enters the Nechako Reservoir, an underwater cutting barge, & Eurocan's logging operation at Andrews Bay on Ootsa Lake.
Negatives showing the Nechako Reservoir, the Kenney Dam, & the Skins Lake Spillway which were built to create hydroelectric power to be used by the Alcan aluminum smelter in Kitimat. Also pictured is Des Lake, Alcan barge Tahtsa II at East Tahtsa, a view of the Entiako River as it enters the Nechako Reservoir, an underwater cutting barge, & Eurocan's logging operation at Andrews Bay on Ootsa Lake.