Slides of Kitimat buildings:
9 slides of the Kitimat River bridge.
14 various slides of "Cyril Henderson, dwelling on albaross street, city manager, city centre, cormorant school. Nechako centre theatre/gardens, United Church, Arena"
5 slides of the Beach Hospital 1952, until new hospital on Haisla
8 slides of Flying in to Kemano winter + summer
15 slides of various slides: Delta King, original dock, sign of Kitimat, constructors smeltersite + permanent dock.
Slides of Kitimat buildings:
9 slides of the Kitimat River bridge.
14 various slides of "Cyril Henderson, dwelling on albaross street, city manager, city centre, cormorant school. Nechako centre theatre/gardens, United Church, Arena"
5 slides of the Beach Hospital 1952, until new hospital on Haisla
8 slides of Flying in to Kemano winter + summer
15 slides of various slides: Delta King, original dock, sign of Kitimat, constructors smeltersite + permanent dock.
Photographs showing general ground and aerial shots of the Ocelot methanol plant throughout its construction.
Notes
7357-(13,14,16), 80-6-(008,011), 80-7-(051,052), 80-8-(069,073), 80-9-089, 81-01-(147,148,151), 81-03-(179,183,189,200), 81-04-208, Roll 14-No4, Roll 17-(No8,19), 81-07-(380,381,384), 81-09-(441,443,448,449,450), 81-10-(481 to 485,488,498,503,504,506 to 509), 31-9A, 82-03-(820 to 824), 82-06-(953,954,956,958,963,964), 82-07-(979 to 985), 82-08-(996,1001,1004,1006,1009,1014,1018,1035,1051,1056, 1082 to 1089), 82-09-(1118 to 1124), 82-10-(1165,1167,1168,1191,1192), 85-01-(1317,1325,1330), 85-05-(1350,1353,1354), 85-06-(1355,1356)
Negatives showing the earliest construction for the Eurocan Pulp & Paper Mill. Clearing of land and construction of dirt roads can be seen.
Notes
**IMPORTANT NOTE** - Negative slide sleeves are labelled as 2004.16.* , where * represents the item number in each series.
80001, 80003, 80004, 80006, 80011, 80013, 80017, 80045, 80047, 80052, 80054, 80058
Negatives showing large steel parts for the mill and other steel structures that were on the Eurocan site after roughly the first 1.5 years of construction.
Negatives showing large steel parts for the mill and other steel structures that were on the Eurocan site after roughly the first 1.5 years of construction.