View of the bow of the Delta King while dry docked at the Alcan Smelter Site. Used as a temporary residence for Alcan workers. Preparations for refloating are in progress.
View of the bow of the Delta King while dry docked at the Alcan Smelter Site. Used as a temporary residence for Alcan workers. Preparations for refloating are in progress.
View of the Delta King stern while dry docked at the Alcan Smelter Site. Used as a temporary residence for Alcan Workers, preperations for re-floating are in progress.
View of the Delta King stern while dry docked at the Alcan Smelter Site. Used as a temporary residence for Alcan Workers, preperations for re-floating are in progress.
Photograph of an aerial view the the Alcan plant and Kitimat River Delta. Alcan plant is visible above while the delta is below.
Notes
Back of photo has 2 dates, Jan 23 1985 and Jan 23 1986. The 1986 date is a sticker add on, while the 1985 date is stamped on. The 1985 date is believed to be correct.
Photograph of aerial of the Kitimat River Delta, Alcan Plant and part of the Ocelot Operation. Alcan Plant is visible above, Kitimat River Delta below, and Ocelot is to the right.
Photograph of aerial of the Kitimat River Delta, Alcan Plant and part of the Ocelot Operation. Alcan Plant is visible above, Kitimat River Delta below, and Ocelot is to the right.
Notes
Back of photo has 2 dates, Jan 23 1985 and Jan 23 1986. The 1986 date is a sticker add on, while the 1985 date is stamped on. The 1985 date is believed to be correct.