Photograph of view looking west across the Kitimat River bridge showing the west span erected and bolted, and the lower chord of the east span about halfway across the main channel.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view looking west across the Kitimat River bridge showing the west span erected and bolted, and the lower chord of the east span about halfway across the main channel.
Photograph of view showing east span of Kitimat River bridge. Note very low water level (elevation 39.9) and recording gauge installed on downstream side of centre pier.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view showing east span of Kitimat River bridge. Note very low water level (elevation 39.9) and recording gauge installed on downstream side of centre pier.
Photograph of aerial view of the Kitimat River bridge site looking east. The townsite camp can be seen at upper right. The building erected at left centre on the river bank is the clubhouse of the Kitimat Rod & Gun club.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of aerial view of the Kitimat River bridge site looking east. The townsite camp can be seen at upper right. The building erected at left centre on the river bank is the clubhouse of the Kitimat Rod & Gun club.
Photo showing Kildala student Wayne Braid telling visitor Bob Foster his school had just as large as a fish as you could catch in the Kitimat river. Kildala school officially opened Friday by UBC Dean of Education Neville Scarfe.
Northern Sentinel Box #3 -(A) Historical (I) School District # 80 (a) Elementary Schools (i) Kildala Elementary
Scope and Content
Photo showing Kildala student Wayne Braid telling visitor Bob Foster his school had just as large as a fish as you could catch in the Kitimat river. Kildala school officially opened Friday by UBC Dean of Education Neville Scarfe.
Photograph of view of Kitimat River bridge looking west. East pier in foreground showing whalers in place with sheet piling driven to grade. Center pier-right-two bearingpiles driven to required bearing. Left-sixty foot pile in place for splicing. Temporary bridge-crew completing placing rock in pier.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view of Kitimat River bridge looking west. East pier in foreground showing whalers in place with sheet piling driven to grade. Center pier-right-two bearingpiles driven to required bearing. Left-sixty foot pile in place for splicing. Temporary bridge-crew completing placing rock in pier.