Photograph of the construction crews are racing the weather in Kitimat trying to get holes dug and filled in again before the fall rains and the winter snows. In Service Centre along side commercial Ave, a back hoe digs a trench for the laying of sewer pipes which next year will carry Service Centre wastes to the new sewage treatment plant. A specially equipped B.C. hydro truck holds power pole upright and rigid during the excavation.
Photograph of the construction crews are racing the weather in Kitimat trying to get holes dug and filled in again before the fall rains and the winter snows. In Service Centre along side commercial Ave, a back hoe digs a trench for the laying of sewer pipes which next year will carry Service Centre wastes to the new sewage treatment plant. A specially equipped B.C. hydro truck holds power pole upright and rigid during the excavation.
Photograph of the B.C. Hydro crews that have just completed string 56 miles of Alcan cable along Highway 16 between Vanderhoof and Endako. This is a 60,00 volt line of A.C.S.R (Aluminum conductor steel reinforced). The cable was made at Alcan's Vancouver works from Kitimat metal and the line was energized to supply the Endako Mines site, 37 miles east of BurnsLake.
Photograph of the B.C. Hydro crews that have just completed string 56 miles of Alcan cable along Highway 16 between Vanderhoof and Endako. This is a 60,00 volt line of A.C.S.R (Aluminum conductor steel reinforced). The cable was made at Alcan's Vancouver works from Kitimat metal and the line was energized to supply the Endako Mines site, 37 miles east of BurnsLake.