View of the bow of the Delta King while dry docked at the Alcan Smelter Site. Used as a temporary residence for Alcan workers. Preparations for refloating are in progress.
View of the bow of the Delta King while dry docked at the Alcan Smelter Site. Used as a temporary residence for Alcan workers. Preparations for refloating are in progress.
View of the Delta King stern while dry docked at the Alcan Smelter Site. Used as a temporary residence for Alcan Workers, preperations for re-floating are in progress.
View of the Delta King stern while dry docked at the Alcan Smelter Site. Used as a temporary residence for Alcan Workers, preperations for re-floating are in progress.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Photograph of an aerial view the the Alcan plant and Kitimat River Delta. Alcan plant is visible above while the delta is below.
Notes
Back of photo has 2 dates, Jan 23 1985 and Jan 23 1986. The 1986 date is a sticker add on, while the 1985 date is stamped on. The 1985 date is believed to be correct.
Photograph of aerial of the Kitimat River Delta, Alcan Plant and part of the Ocelot Operation. Alcan Plant is visible above, Kitimat River Delta below, and Ocelot is to the right.
Photograph of aerial of the Kitimat River Delta, Alcan Plant and part of the Ocelot Operation. Alcan Plant is visible above, Kitimat River Delta below, and Ocelot is to the right.
Notes
Back of photo has 2 dates, Jan 23 1985 and Jan 23 1986. The 1986 date is a sticker add on, while the 1985 date is stamped on. The 1985 date is believed to be correct.
Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.
Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.