Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Photograph showing Haisla Bridge construction. Temp bridge with a vehicle on it is visible on the left. People working and machinery can be seen up on the bridge on the right.
Photograph showing Haisla Bridge construction. Temp bridge with a vehicle on it is visible on the left. People working and machinery can be seen up on the bridge on the right.
Notes
Photo is in two parts and taped together in the middle.