Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Aerial view of the smelter area looking north. Note rectifier buildings mainly closed in and roofing nearing completion. Potline footings are begining to extend east of the centre passageway.
Aerial view of the smelter area looking north. Note rectifier buildings mainly closed in and roofing nearing completion. Potline footings are begining to extend east of the centre passageway.
Kitimat General Hospital : With an ultimat capacity of 219 beds, this magnificent building, costing $3,200,000, was opened March 19th 1960, by the Honorable Eric Martin, Provincial Minister of Health Services and Hospital Insurance.
Kitimat General Hospital : With an ultimat capacity of 219 beds, this magnificent building, costing $3,200,000, was opened March 19th 1960, by the Honorable Eric Martin, Provincial Minister of Health Services and Hospital Insurance.