Looking north from sandhill (elev. 640 +) to site of permanent bridge center left, Townsite camp center right edge of photo, and Townsite ridge left to right.
Looking north from sandhill (elev. 640 +) to site of permanent bridge center left, Townsite camp center right edge of photo, and Townsite ridge left to right.
Kitimat General Hospital : With an ultimat capacity of 219 beds, this magnificent building, costing $3,200,000, was opened March 19th 1960, by the Honorable Eric Martin, Provincial Minister of Health Services and Hospital Insurance.
Kitimat General Hospital : With an ultimat capacity of 219 beds, this magnificent building, costing $3,200,000, was opened March 19th 1960, by the Honorable Eric Martin, Provincial Minister of Health Services and Hospital Insurance.