Aerial view of Nechako Neighbourhood looking east. looking east. Note clearing for B-III on left side of picture and clearing for City Centre and Neighbourhood D on the right side.
Aerial view of Nechako Neighbourhood looking east. looking east. Note clearing for B-III on left side of picture and clearing for City Centre and Neighbourhood D on the right side.
Aerial view of the townsite clearing looking North. Note, City Centre in left foreground with clearing for main sewer outfall extending across to the lower right hand corner of photograph
Aerial view of the townsite clearing looking North. Note, City Centre in left foreground with clearing for main sewer outfall extending across to the lower right hand corner of photograph
Photograph showing concrete being poured and slab finished for the first floor in the No.2 Commercial Building Note : formwork for colums and roof slab in background.
1 photograph :
b&w ; 18 x 12.5 cm
b&w ; 18 x 12.5 cm
Scope and Content
Photograph showing concrete being poured and slab finished for the first floor in the No.2 Commercial Building Note : formwork for colums and roof slab in background.
Photograph of City Centre showing the lower pedestrian mall being used as haul road. Trucks are driving on the road. Note drilling rig at right of photograph. Lots of water around.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of City Centre showing the lower pedestrian mall being used as haul road. Trucks are driving on the road. Note drilling rig at right of photograph. Lots of water around.
Photograph of excavation for Kelly Douglas supermarket in the City Centre. Commonwealth construction has the contract for this building. There is currently a foundation hole dug. In the foreground is a pile of cinderblocks and a car. Up on the hill in the background, Albatross homes are visible.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of excavation for Kelly Douglas supermarket in the City Centre. Commonwealth construction has the contract for this building. There is currently a foundation hole dug. In the foreground is a pile of cinderblocks and a car. Up on the hill in the background, Albatross homes are visible.
Photograph of aerial photograph taken from over townsite camp looking toward City Centre showing extent of clearing in C-I area. Haisla Blvd. can be seen on left-hand side of the picture. At bottom a single structure can be seen. Some snow is behind it. In the very back Douglas Channel is visible.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of aerial photograph taken from over townsite camp looking toward City Centre showing extent of clearing in C-I area. Haisla Blvd. can be seen on left-hand side of the picture. At bottom a single structure can be seen. Some snow is behind it. In the very back Douglas Channel is visible.
The crew of DC-3 casting machine raised the 15, 000 lb ingot containing the two millionth ton of aluminum production at Kitimat Works on October 14, 1966. Caption from article published in the Ingot. Asst. Works Manager T.L. "Bud" Gibson was on hand to congratulate DC-3 operator Manuel Trigo. Also shown in the photo from left are Bruno Unger, shift foreman, John Jeffrey, general foreman, Evaristo de Melo, asst. operator, Heinz Kaimbach, asst. op., Manuel DeCosta, shift foreman, Paul Loeffier, Op. slab saw, Mr. Gibson and Mr. Trigo; Casting Division Superintendent Jim Bell, Packaging and Shipping general foreman Bill Keith, day foreman Tony Coppens, Casting Superintendent Bob Reid, shift foreman Bernard Dicker, main. foreman Earl Welin and day foreman Helmut Benn. Dimensions of the ingot in the picture are 20 1/2" x 40" x 187". It weights 15, 147 lbs.
The crew of DC-3 casting machine raised the 15, 000 lb ingot containing the two millionth ton of aluminum production at Kitimat Works on October 14, 1966. Caption from article published in the Ingot. Asst. Works Manager T.L. "Bud" Gibson was on hand to congratulate DC-3 operator Manuel Trigo. Also shown in the photo from left are Bruno Unger, shift foreman, John Jeffrey, general foreman, Evaristo de Melo, asst. operator, Heinz Kaimbach, asst. op., Manuel DeCosta, shift foreman, Paul Loeffier, Op. slab saw, Mr. Gibson and Mr. Trigo; Casting Division Superintendent Jim Bell, Packaging and Shipping general foreman Bill Keith, day foreman Tony Coppens, Casting Superintendent Bob Reid, shift foreman Bernard Dicker, main. foreman Earl Welin and day foreman Helmut Benn. Dimensions of the ingot in the picture are 20 1/2" x 40" x 187". It weights 15, 147 lbs.
1 film reel of 'The Kitimat Story'. In a large, brown film box. Heavy. Box has old labels on it. One peeled off, and the other is a label from Canadian National Express. Under that is embossed label saying "Made in USA", Top there is hand written text that reads "J.E. Mitchell Kitimat". There is also a DVD included with copy of the footage.
Originally owned by Donald R.C. Morris. Donated by Patricia Morris.
Scope and Content
1 film reel of 'The Kitimat Story'. In a large, brown film box. Heavy. Box has old labels on it. One peeled off, and the other is a label from Canadian National Express. Under that is embossed label saying "Made in USA", Top there is hand written text that reads "J.E. Mitchell Kitimat". There is also a DVD included with copy of the footage.
Notes
Note on DVD says that it is "Alcan Builds in Kitimat", but comparing to our own footage, the proper title is 'The Kitimat Story'.