Photo showing Alcan industrial site, during the Alcan project and Potlines 1 and 2, as well as scenery in background, Mount Elizabeth and tidal flats seen.
Photo showing Alcan industrial site, during the Alcan project and Potlines 1 and 2, as well as scenery in background, Mount Elizabeth and tidal flats seen.
Photograph of Smelter Pot Lines. On back reads 'Pot Rooms One A,B,&C (r to l). These threee pot rooms comprise one pot line. There are two such pot lines nearing completion. When the project is completed there will be 8 pot lines or in other words 24 pot rooms, each 1200 feet long.'
Photograph of Smelter Pot Lines. On back reads 'Pot Rooms One A,B,&C (r to l). These threee pot rooms comprise one pot line. There are two such pot lines nearing completion. When the project is completed there will be 8 pot lines or in other words 24 pot rooms, each 1200 feet long.'
Photograph of Potline 2 looking south west from roof of the forge shop. Note purlin clips welded for roof deck. Column forms in place. Concrete being poured for top lift air duct entrance Potroom 2B. Rectified building #102 at right.
Photograph of Potline 2 looking south west from roof of the forge shop. Note purlin clips welded for roof deck. Column forms in place. Concrete being poured for top lift air duct entrance Potroom 2B. Rectified building #102 at right.