Skip header and navigation

Revise Search

5 records – page 1 of 1.

Haisla Boulevard Pedestrian Walkway Bridge

https://collections.kitimatmuseum.ca/en/permalink/description34894
Part Of
Ware Collection
Description Level
Series
GMD
graphic material
Date Range
1958
Accession Number
2011.4.6
Scope and Content
Photographs of the Haisla Boulevard pedestrian walkway bridge. Photos include bridge before centre support was installed, and after.
Part Of
Ware Collection
Description Level
Series
Accession Number
2011.4.6
GMD
graphic material
Date Range
1958
Physical Description
16 Photographs : b&w
History / Biographical
John Ware was a past employee of the Kitimat Town Planning Department (1957-1959). He was hired by Hollister Kent, Planning Director for Kitimat. During his two years here, Dr. ware designed the first Kitimat street signs, the Haisla Boulevard overpass, and the Hirsch Creek Park shelter centennial project (1858-1958). He was layed off when Alcan lost major Aluminum buyers and the town expansion halted, resulting in a cut back of Kirtimat employees. He then moved to the USA.
Custodial History
Donated by John Ware.
Scope and Content
Photographs of the Haisla Boulevard pedestrian walkway bridge. Photos include bridge before centre support was installed, and after.
Notes
Further info on the walkway bridge - the pedestrian overpass was designed by John Ware to carry people, heavy wet snow loads and walkway snow plow, with a large saftey factor. The central span was designed as the maximum length of concrete double 'Tee' beam that could be carried on an open flatbed railroad car through the Canadian Rocky Mountains. The pre-stressed central span was supported on each end by poured reinforced concrete cantilevers built clear of the multi-lane highway. Initial structural calculations were done out by the very capable Kitimat Town Engineer Graydon. His calculations were checked by Kitimat's consulting engineering firm in Vancouver. Ware's design and the engineer's calculations were then sent to a pre-stressed concrete manufacturer in Calgary. When the beam arrived it was properly installed between the two cantilevers, and metal handrails were added just before the winter snow arrived. The bridge was deseigned to self support without any needed centre support. However, when city officials saw the light looking long span walkway bridge they decided that it was too fragile and that a column must be placed at mid span to give it adequate support. This decision would result in a fatal vehicle accident, as wet snows caused a driver to lose control and crash into it.
Name Access
Ware, John
Subject Access
Kitimat
Overpass
Haisla
Storage Location
Archives Bay 2 Top Box 42

Haisla Boulevard Pedestrian Walkway Bridge

https://collections.kitimatmuseum.ca/en/permalink/description34896
Part Of
Ware Collection
Description Level
Series
GMD
graphic material
Date Range
1958
Accession Number
2011.4.7
Scope and Content
Photographs of the Haisla Boulevard pedestrian walkway bridge concept.
Preliminary sketch design for walkway bridge over 4 lane divided highway. Designed by Jack Ware in collaboration with:
Kitimat municipal structural engineer-Bryan Graydon
Calgary-prestressed concrete beam design structural engineers
Kitimat municipal structural engineering consultants-Vancouver
Note
Center prestressed beam is supported by the cantilevered beams at each end
Prestressed beam was the longest beam that could be carried on a rail flatbed car across tocky mountains in 1958
Design of supports was simplified to round columns for ease of construction
Part Of
Ware Collection
Description Level
Series
Accession Number
2011.4.7
GMD
graphic material
Date Range
1958
Physical Description
2 Photographs : b&w
History / Biographical
John Ware was a past employee of the Kitimat Town Planning Department (1957-1959). He was hired by Hollister Kent, Planning Director for Kitimat. During his two years here, Dr. ware designed the first Kitimat street signs, the Haisla Boulevard overpass, and the Hirsch Creek Park shelter centennial project (1858-1958). He was layed off when Alcan lost major Aluminum buyers and the town expansion halted, resulting in a cut back of Kirtimat employees. He then moved to the USA.
Custodial History
Donated by John Ware.
Scope and Content
Photographs of the Haisla Boulevard pedestrian walkway bridge concept.
Preliminary sketch design for walkway bridge over 4 lane divided highway. Designed by Jack Ware in collaboration with:
Kitimat municipal structural engineer-Bryan Graydon
Calgary-prestressed concrete beam design structural engineers
Kitimat municipal structural engineering consultants-Vancouver
Note
Center prestressed beam is supported by the cantilevered beams at each end
Prestressed beam was the longest beam that could be carried on a rail flatbed car across tocky mountains in 1958
Design of supports was simplified to round columns for ease of construction
Notes
Further info on the walkway bridge - the pedestrian overpass was designed by John Ware to carry people, heavy wet snow loads and walkway snow plow, with a large saftey factor. The central span was designed as the maximum length of concrete double 'Tee' beam that could be carried on an open flatbed railroad car through the Canadian Rocky Mountains. The pre-stressed central span was supported on each end by poured reinforced concrete cantilevers built clear of the multi-lane highway. Initial structural calculations were done out by the very capable Kitimat Town Engineer Graydon. His calculations were checked by Kitimat's consulting engineering firm in Vancouver. Ware's design and the engineer's calculations were then sent to a pre-stressed concrete manufacturer in Calgary. When the beam arrived it was properly installed between the two cantilevers, and metal handrails were added just before the winter snow arrived. The bridge was deseigned to self support without any needed centre support. However, when city officials saw the light looking long span walkway bridge they decided that it was too fragile and that a column must be placed at mid span to give it adequate support. This decision would result in a fatal vehicle accident, as wet snows caused a driver to lose control and crash into it.
Name Access
Ware, John
Subject Access
Kitimat
Overpass
Haisla
Storage Location
Archives Bay 2 Top Box 42
Part Of
Anglican Church Fonds
Description Level
Series
GMD
graphic material
Date Range
1975
Accession Number
2004.21.16
Scope and Content
Photograph of aerial view of Kitimat townsite, 1975. Nechako, Kildala, and in progress Whitesail, and neighbourhood D clearing sites visible. Alcan and Eurcan sites also visible on right side.
Part Of
Anglican Church Fonds
Description Level
Series
Accession Number
2004.21.16
GMD
graphic material
Date Range
1975
Physical Description
1 photograph print ; b&w : 14 x 14.5cm
Custodial History
Photos donated by Joan Smith for Anglican Church 50th Anniversary. Donated in April 2003.
Scope and Content
Photograph of aerial view of Kitimat townsite, 1975. Nechako, Kildala, and in progress Whitesail, and neighbourhood D clearing sites visible. Alcan and Eurcan sites also visible on right side.
Subject Access
Anglican Church
Storage Location
Photograph storage

Site of the Church with Rev J. Tucker

https://collections.kitimatmuseum.ca/en/permalink/description34430
Part Of
Anglican Church Fonds
Description Level
Series
GMD
graphic material
Date Range
1953
Accession Number
2004.21.10
Scope and Content
Photograph of townsite. The site of the church and Rev. J. Tucker standing on top of the tree debrees.
Part Of
Anglican Church Fonds
Description Level
Series
Accession Number
2004.21.10
GMD
graphic material
Date Range
1953
Physical Description
1 photograph print ; b&w : 12.5 x 12cm
Custodial History
Photos donated by Joan Smith for Anglican Church 50th Anniversary. Donated in April 2003.
Scope and Content
Photograph of townsite. The site of the church and Rev. J. Tucker standing on top of the tree debrees.
Name Access
Tucker, J.
Subject Access
Anglican Church
Storage Location
Photograph storage

Envelope Addressed to Mrs. T. B. Moore, from M.Kaitz Containing Mining Claim Info and Letter

https://collections.kitimatmuseum.ca/en/permalink/description34900
Part Of
Wood Collection
Description Level
Series
GMD
textual records
cartographic material
Accession Number
2010.13.14
Scope and Content
One envelope to Mrs. T.B. Moore from M. Kraitz containing mining claim info and a letter.
Letter to Mrs. Moore. December 16, 1945.
Mineral Hill No3. L.6813. Coordinate plan.
Plan of Mineral Hill Group of Mineral Claims Kitimat Valley Range V. Coast District.Scale: 300ft. to 1in.
B.C. Chamber of Mines, Vancouver, B.C. File for Iron Mountain Group.
Part Of
Wood Collection
Description Level
Series
Accession Number
2010.13.14
GMD
textual records
cartographic material
Physical Description
1 Envelope with Contents
History / Biographical
These items were obtained by Aubrey from John Pitman Moore. John was the son of Elizabeth Moore who was matron at the Elizabeth Long Girls School.
Custodial History
Donated by Aubrey Wood
Scope and Content
One envelope to Mrs. T.B. Moore from M. Kraitz containing mining claim info and a letter.
Letter to Mrs. Moore. December 16, 1945.
Mineral Hill No3. L.6813. Coordinate plan.
Plan of Mineral Hill Group of Mineral Claims Kitimat Valley Range V. Coast District.Scale: 300ft. to 1in.
B.C. Chamber of Mines, Vancouver, B.C. File for Iron Mountain Group.
Subject Access
Mining
Storage Location
Archives Bay 2 Top Box 42