Early post glacial shells from the time when the ocean rushed into the Kitimat Valley to the 700 level. Shells are from Mickey's Cove (Moon Bay) South Northern Dock. The shells were exposed by the April 27, 1975 land-sea slide at Mickey's Cove, where "Rivtow Straits" had worked on new docking facilities. The slide started in the bush higher up and the shell slid down with it, indicating same as at Rod and Gun Club, that the sea level was much higher pretty recently. The shells are not fossilized.
Jingle shells (Pododesmus) 76-28-1 & -2, Small seallop (Chlamys) 76-28-3, Small Clam 76-28-4 & -5, Tube Worm 76-28-6, Clam 76-28-7 & 8, Clams 76-28-9 to -13
18 vials, some numbered, some not.
Early post glacial shells from the time when the ocean rushed into the Kitimat Valley to the 700 level. Shells are from Mickey's Cove (Moon Bay) South Northern Dock. The shells were exposed by the April 27, 1975 land-sea slide at Mickey's Cove, where "Rivtow Straits" had worked on new docking facilities. The slide started in the bush higher up and the shell slid down with it, indicating same as at Rod and Gun Club, that the sea level was much higher pretty recently. The shells are not fossilized.
Jingle shells (Pododesmus) 76-28-1 & -2, Small seallop (Chlamys) 76-28-3, Small Clam 76-28-4 & -5, Tube Worm 76-28-6, Clam 76-28-7 & 8, Clams 76-28-9 to -13
18 vials, some numbered, some not.
Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.
Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.