White card stock card, outlined in black. Alcan symbol at right, 'a sincere than you from ...' in black print. Inside left text with thank you sentiment and signed by three officials. At right, glued to card stock is a cork and metal coaster with commemorative image of H.R.H. Prince Phillip and R.E. Powell. Kitimat-Kemano August 3, 1954-84.
White card stock card, outlined in black. Alcan symbol at right, 'a sincere than you from ...' in black print. Inside left text with thank you sentiment and signed by three officials. At right, glued to card stock is a cork and metal coaster with commemorative image of H.R.H. Prince Phillip and R.E. Powell. Kitimat-Kemano August 3, 1954-84.
Photograph of mountain side, three muck cars pulled by a mining locomotive on rail tracks. Bottom of photo has large black bear squating on the side of the tracks, defecating.
Photographer Harry McGee. Donated by his daughter Christine Del Duca. Originally sent to DOK Mayor's Office.
Scope and Content
Photograph of mountain side, three muck cars pulled by a mining locomotive on rail tracks. Bottom of photo has large black bear squating on the side of the tracks, defecating.
10 slides featuring image of Kitimat in 1980. Slides include images of the Safety Building, hospital, an aerial, Moore Creek waterfall, golf course, centennial park, Lakelse Lake, Alcan Office, and Kitimat River.
10 slides featuring image of Kitimat in 1980. Slides include images of the Safety Building, hospital, an aerial, Moore Creek waterfall, golf course, centennial park, Lakelse Lake, Alcan Office, and Kitimat River.
Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.
Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.
Aerial picture showing Riverlodge under construction. Note piles in place for Mess Hall and single room dormitories and grading being undertaken on Rec. Hall and Rec. Field sites
Aerial picture showing Riverlodge under construction. Note piles in place for Mess Hall and single room dormitories and grading being undertaken on Rec. Hall and Rec. Field sites