Skip header and navigation

Revise Search

2 records – page 1 of 1.

Northwest View of Pile Driving Operation for Timber Bridge

https://collections.kitimatmuseum.ca/en/permalink/description16708
Part Of
Alcan Collection
Description Level
Item
GMD
graphic material
Date Range
22 Aug 1956
Accession Number
76.66.436
Scope and Content
View looking northwest of pile driving operations for timber bridge across Road "N" in Neighbourhood "C". Note Townsite Contractors lumber storage yard in background.
Part Of
Alcan Collection
Description Level
Item
Accession Number
76.66.436
GMD
graphic material
Date Range
22 Aug 1956
Physical Description
1 photograph : b&w ; 24.5 x 20 cm
Scope and Content
View looking northwest of pile driving operations for timber bridge across Road "N" in Neighbourhood "C". Note Townsite Contractors lumber storage yard in background.
Notes
J-2-436
Subject Access
Construction
Kitimat-Kemano Project
Bridge
Geographic Access
Kildala
Columbia Street
Storage Location
photograph storage
Part Of
Public archives of Canada
Description Level
Item
GMD
graphic material
Date Range
1900
Accession Number
75.69.2
Scope and Content
Saska River Bridge. Length overall 177 feet, clear span 67 feet built by Survey Party in 2 1/2 days. 100 horses and mules crossed the following morning. Current 10 miles per hour.
Part Of
Public archives of Canada
Description Level
Item
Accession Number
75.69.2
GMD
graphic material
Date Range
1900
Physical Description
1 photograph : b&w ; 25 x 20 cm
Scope and Content
Saska River Bridge. Length overall 177 feet, clear span 67 feet built by Survey Party in 2 1/2 days. 100 horses and mules crossed the following morning. Current 10 miles per hour.
Subject Access
Pioneer
Structure
Bridge
Geographic Access
Suskwa River
Storage Location
photograph storage