Permanent Camp, 5 bunkhouses and cafeteria. Drill rig on green coke storage hole. Area in foreground to be hydraulic filled. North-South Mole at elev. 21.5 awash in immediate foreground. Taken from North-South Mole.
Permanent Camp, 5 bunkhouses and cafeteria. Drill rig on green coke storage hole. Area in foreground to be hydraulic filled. North-South Mole at elev. 21.5 awash in immediate foreground. Taken from North-South Mole.
Steel reinforcing rods for concrete work arrive at Kitimat warf from Vancover by barges. A BE truck-mounted crane lifts them off and places them on the International L-190 trucks. Here is the way all supplies come into Kitimat at the present time.
Steel reinforcing rods for concrete work arrive at Kitimat warf from Vancover by barges. A BE truck-mounted crane lifts them off and places them on the International L-190 trucks. Here is the way all supplies come into Kitimat at the present time.
Photograph of the caisson dock construction for the Alcan project in Kitimat. Caisson frames are in place, and trucks are visible working bellow. Photo is a panorama.
Frank G. Hendy was a former employee of Kitimat Construction during original building.
Custodial History
Photo was donated on August 3, 1984 for the 30th anniversary.
Scope and Content
Photograph of the caisson dock construction for the Alcan project in Kitimat. Caisson frames are in place, and trucks are visible working bellow. Photo is a panorama.