Aerial view of the smelter area looking north. Note rectifier buildings mainly closed in and roofing nearing completion. Potline footings are begining to extend east of the centre passageway.
Aerial view of the smelter area looking north. Note rectifier buildings mainly closed in and roofing nearing completion. Potline footings are begining to extend east of the centre passageway.
Photo album (cover missing) and assorted loose photos of smelter construction in the 1950's with panoramas, unidentified navy ship, haisla bridge, smelter, Caisson dock. Photo album includes aerials, potline construction, worker accommodation, power operations construction, Haisla bridge, caisson dock, dredging, transportation, and sandhill.
Photo album (cover missing) and assorted loose photos of smelter construction in the 1950's with panoramas, unidentified navy ship, haisla bridge, smelter, Caisson dock. Photo album includes aerials, potline construction, worker accommodation, power operations construction, Haisla bridge, caisson dock, dredging, transportation, and sandhill.
Notes
Photos removed from album pages and put in envelopes.
Aerial photo of the Alcan aluminum smelter site, and the Douglas Channel. Taken from the north looking south. Note - bottom left corner is a portion of the Anderson Creek construction camp.
Aerial photo of the Alcan aluminum smelter site, and the Douglas Channel. Taken from the north looking south. Note - bottom left corner is a portion of the Anderson Creek construction camp.