Photograph showing concrete being poured and slab finished for the first floor in the No.2 Commercial Building Note : formwork for colums and roof slab in background.
1 photograph :
b&w ; 18 x 12.5 cm
b&w ; 18 x 12.5 cm
Scope and Content
Photograph showing concrete being poured and slab finished for the first floor in the No.2 Commercial Building Note : formwork for colums and roof slab in background.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.