Photograph of Kemano Timber Co. building. Behind the building are piles of wood planks, other buildings, and a burner structure with a conveyor going in and smoke coming out. There is a forested mountainside in the background.
Kemano Timber Limited photos. The President and CEO was Ernest G. McCorkell.
Custodial History
Photos donated by James (Jim) Stewart.
Scope and Content
Photograph of Kemano Timber Co. building. Behind the building are piles of wood planks, other buildings, and a burner structure with a conveyor going in and smoke coming out. There is a forested mountainside in the background.
Photo showing 'Kitmano' docked at Kemano, B.C. (part of the Alcan Project). L/R Bob Ashmore, Dan Hayes (Supt. Wharf Alcan: Kitimat Works); Arv Sestrap (Insurance, Charter Business); Canada Life, Resident, District Rep. Kitimat
Photo showing 'Kitmano' docked at Kemano, B.C. (part of the Alcan Project). L/R Bob Ashmore, Dan Hayes (Supt. Wharf Alcan: Kitimat Works); Arv Sestrap (Insurance, Charter Business); Canada Life, Resident, District Rep. Kitimat
Photo depicts six people standing on the Kemano Wharf. From left is Mr. K. Roestad; Mr. Percy E. Radley; Mr. McNeely DuBose; Mrs. McNeely DuBose; Mr. M.K. Madsen, M.K. Assistant Project Manager and Mr. R.E. Reed, M.K. Area Engineer.
Photo depicts six people standing on the Kemano Wharf. From left is Mr. K. Roestad; Mr. Percy E. Radley; Mr. McNeely DuBose; Mrs. McNeely DuBose; Mr. M.K. Madsen, M.K. Assistant Project Manager and Mr. R.E. Reed, M.K. Area Engineer.
Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.
Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.
Image depicts a humorous reprieve certificate given to employees of the Alcan Project. The content also implies the hardships endured by the Morrison-Knudsen Company workers in Kemano.
Image depicts a humorous reprieve certificate given to employees of the Alcan Project. The content also implies the hardships endured by the Morrison-Knudsen Company workers in Kemano.
Notes
Title based on contents of text. Ernie Archer Collection