View of the gravel fill in place for some of the houses being erected by Hullah construction on Swallow Street. Note the prefabricated forms under erection in centre background.
View of the gravel fill in place for some of the houses being erected by Hullah construction on Swallow Street. Note the prefabricated forms under erection in centre background.
Photo depicts flat-top temporary housing lining the hillside up to the Aluminum City Motel at the treeline. View is northwest. Grader on Kuldo Boulevard.
Photo depicts flat-top temporary housing lining the hillside up to the Aluminum City Motel at the treeline. View is northwest. Grader on Kuldo Boulevard.
Notes
Alcan Negative No. 29337. -- The circus tent assembly line was erected . Temporary housing destined for Kitimat was assembled at Vancouver Tug and Barge below the Lion's Gate Bridge in three sections, then barged to Kitimat - 10 houses or 30 sections on each barge. -- Electrician Bill Frahler wired approximately 2,000 houses in Kitimat camps and townsite between 1954 and 1958, working first for Johnson-Crooks then Straits Construction, both U.S. contractors.
Photo depicts a view of Minette Bay scow grid with two barges being unloaded. The left barge is loaded with Johnson Crooks materials and the right barge with Hullah Construction materials.
Photo depicts a view of Minette Bay scow grid with two barges being unloaded. The left barge is loaded with Johnson Crooks materials and the right barge with Hullah Construction materials.