Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
View looking East North-East at new maintenance service building and 80' high water tower. Earth work in foreground shows start of grading prior to paving on west side of the building.
View looking East North-East at new maintenance service building and 80' high water tower. Earth work in foreground shows start of grading prior to paving on west side of the building.
THICK STOCK REFINING: View from crane generally looking North. Drive of twin roll press shown at platform level in the forground. Behind this is twin press with one-half of hood raised.
THICK STOCK REFINING: View from crane generally looking North. Drive of twin roll press shown at platform level in the forground. Behind this is twin press with one-half of hood raised.
Looking north from sandhill (elev. 640 +) to site of permanent bridge center left, Townsite camp center right edge of photo, and Townsite ridge left to right.
Looking north from sandhill (elev. 640 +) to site of permanent bridge center left, Townsite camp center right edge of photo, and Townsite ridge left to right.