Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Photographs show a log structure at Raley Creek (Jan 1980), Wadeene River Trapper's Cabin (Jan 1980), Eurocan pollution from Fire Mountain (11 Nov 1979), and Alcan from the Kitamaat Village (Feb 1980).
Photographs taken by Gisela Mendel in her role as museum curator.
Scope and Content
Photographs show a log structure at Raley Creek (Jan 1980), Wadeene River Trapper's Cabin (Jan 1980), Eurocan pollution from Fire Mountain (11 Nov 1979), and Alcan from the Kitamaat Village (Feb 1980).
Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.
Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.