8 photos of Alcan Engineering. 1) Looking East From Centre Passageway Bldg 7B 2) Completed Roof Fan Walking on Potroom 8B West 3) Looking West in Potroom 8B West from Column Line 12 4) Potroom 8B East Looking East from Centre Passageway 5) General View of Progress of Work in Potline 8A East 6) Potroom 8B East Looking East from Centre Passageway 7) Looking East from Centre Passageway Bldg 8A 8) Looking West from Centre Passageway Bldg 8A
8 photos of Alcan Engineering. 1) Looking East From Centre Passageway Bldg 7B 2) Completed Roof Fan Walking on Potroom 8B West 3) Looking West in Potroom 8B West from Column Line 12 4) Potroom 8B East Looking East from Centre Passageway 5) General View of Progress of Work in Potline 8A East 6) Potroom 8B East Looking East from Centre Passageway 7) Looking East from Centre Passageway Bldg 8A 8) Looking West from Centre Passageway Bldg 8A
Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.
Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.