Aerial picture showing Riverlodge under construction. Note piles in place for Mess Hall and single room dormitories and grading being undertaken on Rec. Hall and Rec. Field sites
Aerial picture showing Riverlodge under construction. Note piles in place for Mess Hall and single room dormitories and grading being undertaken on Rec. Hall and Rec. Field sites
Photo showing Aerial View - Nechako Area (aerial shots were taken at different intervals all through the Alcan Project - Nechako, Kildala, Whitesaile Areas)
Photo showing Aerial View - Nechako Area (aerial shots were taken at different intervals all through the Alcan Project - Nechako, Kildala, Whitesaile Areas)
Photograph of an aerial of the Alcan smelter wharf area. Wharf area is in the front, and vehicles are parked there. Alcan beach is further back. The smelter is in the background. Gold Max Patzelt embossment is on the bottom right corner.
Photograph of an aerial of the Alcan smelter wharf area. Wharf area is in the front, and vehicles are parked there. Alcan beach is further back. The smelter is in the background. Gold Max Patzelt embossment is on the bottom right corner.
Photo depicts two men kneeling beside the first bags of mail to arrive via Pacific Western Airlines. On the right, Captain T. M. Kellough for PWA delivers the bags to on the left, Kitimat Express driver Lloyd Kaberg, at the wharf, Smeltersite. Northern Sentinel Press Collection
Photo depicts two men kneeling beside the first bags of mail to arrive via Pacific Western Airlines. On the right, Captain T. M. Kellough for PWA delivers the bags to on the left, Kitimat Express driver Lloyd Kaberg, at the wharf, Smeltersite. Northern Sentinel Press Collection
Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.
Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.