Aerial picture showing Riverlodge under construction. Note piles in place for Mess Hall and single room dormitories and grading being undertaken on Rec. Hall and Rec. Field sites
Aerial picture showing Riverlodge under construction. Note piles in place for Mess Hall and single room dormitories and grading being undertaken on Rec. Hall and Rec. Field sites
Photo showing Aerial View - Nechako Area (aerial shots were taken at different intervals all through the Alcan Project - Nechako, Kildala, Whitesaile Areas)
Photo showing Aerial View - Nechako Area (aerial shots were taken at different intervals all through the Alcan Project - Nechako, Kildala, Whitesaile Areas)
Photograph of an aerial of the Alcan smelter wharf area. Wharf area is in the front, and vehicles are parked there. Alcan beach is further back. The smelter is in the background. Gold Max Patzelt embossment is on the bottom right corner.
Photograph of an aerial of the Alcan smelter wharf area. Wharf area is in the front, and vehicles are parked there. Alcan beach is further back. The smelter is in the background. Gold Max Patzelt embossment is on the bottom right corner.
Photo depicts a view of Minette Bay scow grid with two barges being unloaded. The left barge is loaded with Johnson Crooks materials and the right barge with Hullah Construction materials.
Photo depicts a view of Minette Bay scow grid with two barges being unloaded. The left barge is loaded with Johnson Crooks materials and the right barge with Hullah Construction materials.
Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.
Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.