Photo showing 7 international L-190 trucks, complete with Jaegar ReadyMix Concrete Machines, first installment of a large fleet at Kitimat. In early June, these were waiting for completion of batching plant installation. They were used to carry concrete directly to the new smelter, townsite or any construction in progress. Batch plant location is at Gravel Mountain.
Photo showing 7 international L-190 trucks, complete with Jaegar ReadyMix Concrete Machines, first installment of a large fleet at Kitimat. In early June, these were waiting for completion of batching plant installation. They were used to carry concrete directly to the new smelter, townsite or any construction in progress. Batch plant location is at Gravel Mountain.
Photo showing A young boy working under the hoood of a car. He is looking at the camera with his right arm reaching in. He is also wearing a checkered button up shirt, with the sleeves rolled up.
1 photograph : b&w ; 12.7 x 9 cm
1 negative : b&w ; 12.5 x 9.9 cm
Scope and Content
Photo showing A young boy working under the hoood of a car. He is looking at the camera with his right arm reaching in. He is also wearing a checkered button up shirt, with the sleeves rolled up.