Aerial view of Graving Dock showing rough outline of excavation, Access Road into Dock at North West corner, and shovels, double handling base material.
Aerial view of Graving Dock showing rough outline of excavation, Access Road into Dock at North West corner, and shovels, double handling base material.
Photo album (cover missing) and assorted loose photos of smelter construction in the 1950's with panoramas, unidentified navy ship, haisla bridge, smelter, Caisson dock. Photo album includes aerials, potline construction, worker accommodation, power operations construction, Haisla bridge, caisson dock, dredging, transportation, and sandhill.
Photo album (cover missing) and assorted loose photos of smelter construction in the 1950's with panoramas, unidentified navy ship, haisla bridge, smelter, Caisson dock. Photo album includes aerials, potline construction, worker accommodation, power operations construction, Haisla bridge, caisson dock, dredging, transportation, and sandhill.
Notes
Photos removed from album pages and put in envelopes.
Photo depicts an aerial view of Kitimat. Seen is land cleared for Neighbourhood "D" and the Whitesail Neighbourhood under construction, right foreground. The Alcan smelter and channel are in the background.
Photo depicts an aerial view of Kitimat. Seen is land cleared for Neighbourhood "D" and the Whitesail Neighbourhood under construction, right foreground. The Alcan smelter and channel are in the background.
Notes
Title based on content of photograph. -- On the official "Town Plan for Kitimat, B.C." by Stein and Mayer & Whittlesey, Neighbourhood "D", the cleared area in the photo, was to have three elementary schools, and one junior and one senior high school. This neighbourhood was never constructed and was returned to bush.