Photo showing the path to the Kitimat water supply. The water tower can be seen up near the top of a hill in the photo with the path flanked by trees. The pathway is made of a wooden ramp and there is a long hose coming down from the tower with at least two People seen at the towers base.
Photo showing the path to the Kitimat water supply. The water tower can be seen up near the top of a hill in the photo with the path flanked by trees. The pathway is made of a wooden ramp and there is a long hose coming down from the tower with at least two People seen at the towers base.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.