Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-362. -- Messrs. Jenkinson, Wynne-Jones, and Hermann all work for Alcan Engineering under the Resident Engineer George Malby. Messrs. J.B. Whitton and Van Houten work for the consulting firm of Frederick R. Harris & Co. of New York, N.Y. Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.212
Photo depicts seven International L-190 trucks, complete with Jaeger ready-mix concrete machines. These trucks were the first installment of a large fleet at Kitimat.
Photo depicts seven International L-190 trucks, complete with Jaeger ready-mix concrete machines. These trucks were the first installment of a large fleet at Kitimat.
Notes
Title based on content of photograph. -- International Harvester Company No. C 6101. -- Photographed by the International Harvester Company, manufacturers of construction equipment purchased for the Project. -- In early July these trucks were waiting for the completion of the batching plant installation. The trucks carried concrete directly to the new smelter in the townsite and assisted in all other town and smelter construction. -- The batch plant was located at "Gravel Mountain" - the sandhill. Hal Whiting Collection 985.65.107