Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
View showing railway track laying in progress across the site of potlines 3 and 4 into plant, Moore Creek Bridge in the Background Dec.17, 1954 Alcan Neg. # 28529
View showing railway track laying in progress across the site of potlines 3 and 4 into plant, Moore Creek Bridge in the Background Dec.17, 1954 Alcan Neg. # 28529
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Photograph of Michael Nykolaishen (right) receiving a mounted ingot as a retirement gift after having worked for 19 years as a saw centre operator at Alcan.
Mr. Nykolaishen, originally from Manitoba, came to Kitimat from Saskatchewan circa 1956. He worked for Alcan for nearly two decades before retiring and moving down south with his wife.
Custodial History
Donated by Barb Campbell in 2022.
Scope and Content
Photograph of Michael Nykolaishen (right) receiving a mounted ingot as a retirement gift after having worked for 19 years as a saw centre operator at Alcan.