Group photo taken on Aug 3 1951 on occasion of visit of President and Party to South Camp (Nathanael V. Davis, President Aluminum Limited; Mcneely DuBose, VP Alcan; R.E. Powell, President Alcan; Percy E. Radley, British Columbia Project Manager) October 8 1951
1 photograph, b&w ; 17 x 12 cm
1 photograph, b&w ; 24 x 19 cm
Scope and Content
Group photo taken on Aug 3 1951 on occasion of visit of President and Party to South Camp (Nathanael V. Davis, President Aluminum Limited; Mcneely DuBose, VP Alcan; R.E. Powell, President Alcan; Percy E. Radley, British Columbia Project Manager) October 8 1951
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Photograph of town site, Alcan ; buildings in a line from the left to the middle ; a telephone or electricity line crossing over the picture ; landscape in background.
Photographs taken by Gordon Lee donated to the museum by his daughter Michelle Simeoni.
Scope and Content
Photograph of town site, Alcan ; buildings in a line from the left to the middle ; a telephone or electricity line crossing over the picture ; landscape in background.
Photo showing view looking toward site of Pernament Wharf from south dike of graving dock, dredge and dragon line excavating channel from graving dock to deep water, truck dumping gravel for foundation blanket into bottom dump scow.
Photo showing view looking toward site of Pernament Wharf from south dike of graving dock, dredge and dragon line excavating channel from graving dock to deep water, truck dumping gravel for foundation blanket into bottom dump scow.