Photographs of graving dock - caissons are built in a huge hole and then floated out to a stationary position and sunk. This is then the base of the wharf. Photo shows construction area with framework, and people working in a pit.
Fred DeLory worked for Arvida P.Q. and was transferred to Kitimat at the beginning of 1952. He was the first town engineer.
Scope and Content
Photographs of graving dock - caissons are built in a huge hole and then floated out to a stationary position and sunk. This is then the base of the wharf. Photo shows construction area with framework, and people working in a pit.
Slide showing the graving dock where the Alcan wharf caissons were constructed. It is filled with water. Boats and structures are visible on the edge. This area was used for the Kitimat Yacht Club. Behind, the Kitimat River estuary is visible, and beyond that the mountains (Mount Elizabeth obscured by cloud).
James McNay was born in Ayrshire, Scotland, on January 31, 1907. Between 1951 and 1953, he worked in the payroll department for Alcan. He had to leave his wife Effie and his two young daughters, Margaret and Diane, aged 6 and 5 in 1951, at home in Surrey, B.C., during his 3-4 month stints in Kitimat. To fill some of his free time and show his family where he was and what Kitimat was like, he spent many hours walking in the area with a 35mm Kodak camera. He photographed the scenic beauty of the area and parts of the construction of both the smelters and the town. He died in Surrey on August 7, 1983.
Custodial History
Donated by Margaret McNay. Images were taken by her father and sent to their family in Surrey in the 1950s.
Scope and Content
Slide showing the graving dock where the Alcan wharf caissons were constructed. It is filled with water. Boats and structures are visible on the edge. This area was used for the Kitimat Yacht Club. Behind, the Kitimat River estuary is visible, and beyond that the mountains (Mount Elizabeth obscured by cloud).
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Photograph - aerial view of graving dock showing rough outline of excavation, Access Road into Dock at North West corner, and shovels, double handling base material.
Photograph - aerial view of graving dock showing rough outline of excavation, Access Road into Dock at North West corner, and shovels, double handling base material.
Aerial view of Graving Dock showing rough outline of excavation, Access Road into Dock at North West corner, and shovels, double handling base material.
Aerial view of Graving Dock showing rough outline of excavation, Access Road into Dock at North West corner, and shovels, double handling base material.