Oficial Opening of Legion Hall - L/R Wilf Owen (Bugler); Syd Kirk - 2nd Vice-President; B.C.& N.W. States Command of Canadian Legion. Pat Wright, President Brnach Legion #250
Oficial Opening of Legion Hall - L/R Wilf Owen (Bugler); Syd Kirk - 2nd Vice-President; B.C.& N.W. States Command of Canadian Legion. Pat Wright, President Brnach Legion #250
Photo showing construction of the Federal Building. Cost was $508,000. Contractor for the Post Office was Peter Kiewit. Post Office moves to new Federal Building May 1961.
#2 Northern Sentinel: Box #2: Heritage Files - Federal Building.
Scope and Content
Photo showing construction of the Federal Building. Cost was $508,000. Contractor for the Post Office was Peter Kiewit. Post Office moves to new Federal Building May 1961.
Photo showing the Canadian National Railways - Terrace - Kitimat Line Official Opening 8 July 1955. Driving Home the Aluminum Spike from L/R Duncan K. Kerr, Vice-President of Associated Boards of Trade of Central BC. Mr. S.F. Dingle, Vice-President of CNR. Major J.L.Charles, Chief Engineer CNR Western Region; Percy E. Radley, Alcan Project Manager.
Photo showing the Canadian National Railways - Terrace - Kitimat Line Official Opening 8 July 1955. Driving Home the Aluminum Spike from L/R Duncan K. Kerr, Vice-President of Associated Boards of Trade of Central BC. Mr. S.F. Dingle, Vice-President of CNR. Major J.L.Charles, Chief Engineer CNR Western Region; Percy E. Radley, Alcan Project Manager.