Photograph of a view of the Alcan smelter. Photo is taken from up on a hill with fireweed. View is looking east. Eastuary is visible behind the smelter. Beyond that is the channel and mountains. Low mountains have sections of clearcut. Mount Elizabeth in background.
Photograph of a view of the Alcan smelter. Photo is taken from up on a hill with fireweed. View is looking east. Eastuary is visible behind the smelter. Beyond that is the channel and mountains. Low mountains have sections of clearcut. Mount Elizabeth in background.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Photo depicts an aerial view of the smeltersite main camp showing married quarters, sternwheeler Delta King, hydraulic fill in progress, recreation building, hospital, power plant, sawmill and water tank.
Photo depicts an aerial view of the smeltersite main camp showing married quarters, sternwheeler Delta King, hydraulic fill in progress, recreation building, hospital, power plant, sawmill and water tank.
Notes
Title based on content of photograph. -- Alcan ID Numbers BC-2-243 and ACM-24311. Alcan Collection 78.11.32