Photo depicts the powerhouse's Unit No. 4 showing screeds set and resteel installed for concrete pour No. 1 to Elevation 184.0'. The tailrace channel is seen top right.
Photo depicts the powerhouse's Unit No. 4 showing screeds set and resteel installed for concrete pour No. 1 to Elevation 184.0'. The tailrace channel is seen top right.
Notes
Title based on content of photograph. -- Alcan ID No. 5793. Alcan Collection
Photo depicts three men standing beside the scroll case for Unit No. 4, which is awaiting transport into the powerhouse. View is from the portal entrance looking towards Mt. Powell.
Photo depicts three men standing beside the scroll case for Unit No. 4, which is awaiting transport into the powerhouse. View is from the portal entrance looking towards Mt. Powell.
Notes
Title based on content of photograph. -- Alcan ID No. 5793. Alcan Collection
Photo depicts a slash burning on the transmission line right-of-way behind Kitamaat Village.
Notes
Title based on content of photograph. Fred DeLory, Alcan's Resident Engineer at smeltersite, was one of two who signed the incorporation papers for the town of Kitimat. Fred DeLory Collection 2002.15
Photo depicts the Last Spike Ceremony for the Canadian National Railway Terrace to Kitimat line. From left is Duncan K. Kerr, Vice President of Associated Boards of Trade of B.C.; S.F. Dingle, Vice President of C.N.R, seen here driving in the aluminum spike.; Major J.L. Charles, Chief Engineer, C.N.R. Western Region; and Percy E. Radley, Alcan Project Manager.
Photo depicts the Last Spike Ceremony for the Canadian National Railway Terrace to Kitimat line. From left is Duncan K. Kerr, Vice President of Associated Boards of Trade of B.C.; S.F. Dingle, Vice President of C.N.R, seen here driving in the aluminum spike.; Major J.L. Charles, Chief Engineer, C.N.R. Western Region; and Percy E. Radley, Alcan Project Manager.