View showing railway track laying in progress across the site of potlines 3 and 4 into plant, Moore Creek Bridge in the Background Dec.17, 1954 Alcan Neg. # 28529
View showing railway track laying in progress across the site of potlines 3 and 4 into plant, Moore Creek Bridge in the Background Dec.17, 1954 Alcan Neg. # 28529
Photo showing view of Kitimat River Bridge looking west, east pier in foreground showing whalers in place with sheet piling driven to grade, in center: pier, and on right: two bearing piles driven to required bearing. On left, sixty foot pile in place for splicing, temporary bridge crew completing placing rock in pier.
Photo showing view of Kitimat River Bridge looking west, east pier in foreground showing whalers in place with sheet piling driven to grade, in center: pier, and on right: two bearing piles driven to required bearing. On left, sixty foot pile in place for splicing, temporary bridge crew completing placing rock in pier.
Aerial photo of the Kitimat river estuary showing Kitimat River, Kitimat Harbor, Minette Bay, and the Alcan company smelter site taken from the southwest looking northeast towards the Kitimat City Centre.
Aerial photo of the Kitimat river estuary showing Kitimat River, Kitimat Harbor, Minette Bay, and the Alcan company smelter site taken from the southwest looking northeast towards the Kitimat City Centre.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Molly worked + lived in Kitimat (1954-55). Worked at Alcan Pryde Machine Shop, last girl on Kitimat Constructors payroll. Liver at hospital, Smeltersite.
Scope and Content
Collection of photos consisting of Alcan, Smeltersite, Delta King, the sandhill, Kitimat River, Hirsch Creek bridge, Douglas Channel, and the wharf
Notes
Photos were most likely colour origianlly, but have degraded into a pink tone
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
10 slides featuring image of Kitimat in 1980. Slides include images of the Safety Building, hospital, an aerial, Moore Creek waterfall, golf course, centennial park, Lakelse Lake, Alcan Office, and Kitimat River.
10 slides featuring image of Kitimat in 1980. Slides include images of the Safety Building, hospital, an aerial, Moore Creek waterfall, golf course, centennial park, Lakelse Lake, Alcan Office, and Kitimat River.
Photograph of an aerial of the Alcan Plant and Kitimat River Facility. Alcan Plant is visible above and Kitimat River delta is below.
Notes
Back of photo has 2 dates, Jan 23 1985 and Jan 23 1986. The 1986 date is a sticker add on, while the 1985 date is stamped on. The 1985 date is believed to be correct.
Photograph of an aerial view the the Alcan plant and Kitimat River Delta. Alcan plant is visible above while the delta is below.
Notes
Back of photo has 2 dates, Jan 23 1985 and Jan 23 1986. The 1986 date is a sticker add on, while the 1985 date is stamped on. The 1985 date is believed to be correct.