Aerial view looking north at the plant site, with H.M.C.S. Sioux at the wharf. Tide elevation is approximately 2.5 feet, and the extent of the dredge cut in the harbour can be clearly seen.
In Klaus Mueller's possession when Engineering Depart. was dismantled.
Scope and Content
Aerial view looking north at the plant site, with H.M.C.S. Sioux at the wharf. Tide elevation is approximately 2.5 feet, and the extent of the dredge cut in the harbour can be clearly seen.
Photograph of the conference at the site between contractor John Bedard, right, and one of his sub-contractors was held last week as cement pouring of footings for 50 new units went on nearby. Twenty workmen are attempting to get structures roofed in before the arrival of snow. Scheduled opening date for the units is next June 1.
Photograph of the conference at the site between contractor John Bedard, right, and one of his sub-contractors was held last week as cement pouring of footings for 50 new units went on nearby. Twenty workmen are attempting to get structures roofed in before the arrival of snow. Scheduled opening date for the units is next June 1.
View of the inspection party at the door of the Carbon Paste Plant, including left to right Messrs. Vincent, Turney and DuBose, The Governor-General, Messrs. Campbell and Madill, Mr. Lionel Massey, and Messrs. Melrose and Malby.
In Klaus Mueller's possession when Engineering Depart. was dismantled.
Scope and Content
View of the inspection party at the door of the Carbon Paste Plant, including left to right Messrs. Vincent, Turney and DuBose, The Governor-General, Messrs. Campbell and Madill, Mr. Lionel Massey, and Messrs. Melrose and Malby.