Saska River Bridge. Length overall 177 feet, clear span 67 feet built by Survey Party in 2 1/2 days. 100 horses and mules crossed the following morning. Current 10 miles per hour.
Saska River Bridge. Length overall 177 feet, clear span 67 feet built by Survey Party in 2 1/2 days. 100 horses and mules crossed the following morning. Current 10 miles per hour.
Saskwa River Bridge. Length over all 177 feet, clear span 67 feet. Built by Survey Party in 2 1/2 days. 100 horses and mules crossed the following morning. Current 10 miles per hour.
Saskwa River Bridge. Length over all 177 feet, clear span 67 feet. Built by Survey Party in 2 1/2 days. 100 horses and mules crossed the following morning. Current 10 miles per hour.
Photograph showing Haisla Bridge construction. Temp bridge with a vehicle on it is visible on the left. People working and machinery can be seen up on the bridge on the right.
Photograph showing Haisla Bridge construction. Temp bridge with a vehicle on it is visible on the left. People working and machinery can be seen up on the bridge on the right.
Notes
Photo is in two parts and taped together in the middle.
Photograph of Haisla Bridge construction. Looking east, showing bearing piles being driven in centre pier, and sheet piling in position for driving at east pier. Note traffic on temporary bridge.
Photograph of Haisla Bridge construction. Looking east, showing bearing piles being driven in centre pier, and sheet piling in position for driving at east pier. Note traffic on temporary bridge.