Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Photo showing view of the Pan Abode House foundation looking north east showing heating ducts being enclosed in concrete and sewer and water connections being installed.
Photo showing view of the Pan Abode House foundation looking north east showing heating ducts being enclosed in concrete and sewer and water connections being installed.
Photo showing view looking north east at east caisson, inner bulkhead being lifted into place near south end of caisson and trusses being fabricated in front of caisson at far end.