Photo showing view of the Pan Abode House foundation looking north east showing heating ducts being enclosed in concrete and sewer and water connections being installed.
Photo showing view of the Pan Abode House foundation looking north east showing heating ducts being enclosed in concrete and sewer and water connections being installed.