Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Photo showing an Aluminum Company of Canada.smelter tour demonstration guided by Russ Chamberlain (L) and Mervyn Henry (R). The two guides conducting the Plant Tours in 1964 were both third year students from UBC. Mervyn was from Chilliwack and Russ from Penticton.
Photo showing an Aluminum Company of Canada.smelter tour demonstration guided by Russ Chamberlain (L) and Mervyn Henry (R). The two guides conducting the Plant Tours in 1964 were both third year students from UBC. Mervyn was from Chilliwack and Russ from Penticton.
Photo showing view looking north, west half of Storage Building, portion of hydraulic fill area, dyke protecting portion being stripped at right and centre, area in foreground partially stripped.
Photo showing view looking north, west half of Storage Building, portion of hydraulic fill area, dyke protecting portion being stripped at right and centre, area in foreground partially stripped.