Photo showing west end of potroom 2B looking south, showing installation of aluminum roofing, man at left is using Nelson Stud Welder, rectifier building 102 roof at right.
Photo showing west end of potroom 2B looking south, showing installation of aluminum roofing, man at left is using Nelson Stud Welder, rectifier building 102 roof at right.
Photo showing a BE 22-B Trench Hoe digging the trench for sewer and water lines to the family quarters at the Kitimat Construction Camp. These were prefab buildings which were completed at the rate of two daily.
Photo showing a BE 22-B Trench Hoe digging the trench for sewer and water lines to the family quarters at the Kitimat Construction Camp. These were prefab buildings which were completed at the rate of two daily.
Photo showing the muck dredged from the wharf area to provide sufficient water space for large ships dumped on these barges by the Clamshell Bucket and towed out into deep water by a small motor boat, the TD-9 dozer goes to work pushing the load off as they move along.
Photo showing the muck dredged from the wharf area to provide sufficient water space for large ships dumped on these barges by the Clamshell Bucket and towed out into deep water by a small motor boat, the TD-9 dozer goes to work pushing the load off as they move along.