Photo showing brdge site looking west from east bank of Kitimat River, forms for east piers being placed, immediate foreground, guides for sheey piling in place for centre piers, centre background, first piece of sheet piling in place.
Photo showing brdge site looking west from east bank of Kitimat River, forms for east piers being placed, immediate foreground, guides for sheey piling in place for centre piers, centre background, first piece of sheet piling in place.
Photo showing view looking west, centre foreground: forms in place for sheet piling for east piers, right foreground: first and second cribs of east and temporary bridge, centre background: right sheet piling center piers all placed, left-western cribs and deck for temporary bridge being placed.
Photo showing view looking west, centre foreground: forms in place for sheet piling for east piers, right foreground: first and second cribs of east and temporary bridge, centre background: right sheet piling center piers all placed, left-western cribs and deck for temporary bridge being placed.
Photo showing view looking north eat, Kitimat River bridge showing east abutment forms in place and west span falsework. East abutment fill and piled river in left center.
Photo showing view looking north eat, Kitimat River bridge showing east abutment forms in place and west span falsework. East abutment fill and piled river in left center.
Photo showing view of Kitimat River Bridge looking west, east pier in foreground showing whalers in place with sheet piling driven to grade, in center: pier, and on right: two bearing piles driven to required bearing. On left, sixty foot pile in place for splicing, temporary bridge crew completing placing rock in pier.
Photo showing view of Kitimat River Bridge looking west, east pier in foreground showing whalers in place with sheet piling driven to grade, in center: pier, and on right: two bearing piles driven to required bearing. On left, sixty foot pile in place for splicing, temporary bridge crew completing placing rock in pier.
Photo showing a BE 22-B Trench Hoe digging the trench for sewer and water lines to the family quarters at the Kitimat Construction Camp. These were prefab buildings which were completed at the rate of two daily.
Photo showing a BE 22-B Trench Hoe digging the trench for sewer and water lines to the family quarters at the Kitimat Construction Camp. These were prefab buildings which were completed at the rate of two daily.