Photo showing view of the temporary wharf area looking southeast, scow grid in front of crane at elft, cement silos centre and transit ware-house at right.
Photo showing view of the temporary wharf area looking southeast, scow grid in front of crane at elft, cement silos centre and transit ware-house at right.
Photo showing view looking north east at east caisson, inner bulkhead being lifted into place near south end of caisson and trusses being fabricated in front of caisson at far end.
Photo showing view looking north east at east caisson, inner bulkhead being lifted into place near south end of caisson and trusses being fabricated in front of caisson at far end.
Photo showing view looking toward site of Pernament Wharf from south dike of graving dock, dredge and dragon line excavating channel from graving dock to deep water, truck dumping gravel for foundation blanket into bottom dump scow.
Photo showing view looking toward site of Pernament Wharf from south dike of graving dock, dredge and dragon line excavating channel from graving dock to deep water, truck dumping gravel for foundation blanket into bottom dump scow.
Photo showing view looking north west showing coal and coke bine adjacent to the carbon paste plant with truck dumping coke into hopper for feeding into the plant.
Photo showing view looking north west showing coal and coke bine adjacent to the carbon paste plant with truck dumping coke into hopper for feeding into the plant.